Joint Lock Ring Technology Welded ID Wall Seal Type
In-Plant – Lock Ring Insertion Process
Joint Lock Ring is positioned into pipe end.
This completes the In-Plant Lock Ring Insertion Process.
The tool’s Press Plate is attached to the Clamp using 4 Bolts.
The 4 Bolts are tightened to press the ring into final position.
The same procedure is performed on the opposite end.
A 40' section of service pipe is first prepared by chamfering and sanding smooth the internal weld seam at both ends.
The assembly tool is clamped onto the end of the pipe.
A Welded Pressure Seal is applied to the pipe ID wall and the Joint Lock Ring.
This end of the service pipe receives a Joint Lock Ring with a flat, machined face.
Specified bevel is applied to both pipe ends